You gotta stand on something to build a wall. The floor is still sand and needs to be filled in and raised by 2 bag rows. Half of that was done today, along with cleaning 4 trash bags worth of building debris out of the main dome. I won't be building every day anymore for the next few months. It's time to wrap up this phase of intense building. I figure there is 2-3 days of stucco and then the door needs to go on. Then another day or two of finishing stucco and some stucco on the main dome entrance, Hopefully this will be completed soon. After that, the project will shift to exterior patio and walkway slabs.


Sunk 

Marble Country

The following 4 images are out of chronological order. 
Many images in this blog are but in this case its obvious.

Channeling my inner Heeeere's Johnny!
Pulled out the compass today, no more toe stubbing
Do not use this picture.... okay....
Seriously
First drops of a summer rain. XD
Sub Floor poured & leveled by Raquel. I just "supported" her the whole time.
Aaawww
the goat in all her glory 
The Jt
Moonrise