Monday, April 30, 2018

One more floor pour

Whatever that floor leveler was, it didn't dry like I expected and I had to pour a final layer of concrete. It is not my forte so however smooth it end up is how smooth it will be. I also plugged the hole in the main dome's floor that has persisted for so long. I am looking to seal both floors next time.


Raquel discovered a scorpion when she was cleaning up the jobsite. 

This pile is chunks of plaster and cement that never made it to their destination. It will become filler for raised beds and other landscaping.

Perfectly smooth floors are not in the cards

Both windows are waiting for home depot to restock the stucco.