Monday, December 19, 2016

Floor Pour

Another solo Sunday. After sanding and cleaning inside the small dome and the porthole windows, at Sunset I began to mix cement to pour the floor in the small dome. It took six batches mixed by hand to get decent coverage. By the time I was ready to trowel, my arms were so weak and fatigued that I could barely balance to do the work. I will have to do another layer. I will pour the big dome floor in sections to make it easier to work.

pond liner moisture barrier 

2 whellbarrow's worth of cement/sand mix (4:1.5)
after 4 barrows, barely covered
I need a cement mixer, bad! 
Just walk away!